翻訳と辞書 |
Çetin Dam
The Çetin Dam is a rock-fill dam with an asphalt-concrete core, currently being constructed on the Botan River in Siirt Province, Turkey. The dam will be located directly downstream of the Botan and Büyük River confluence and have a height of . The primary purpose of the dam is hydroelectric power generation. The dam's power plant will house three 135 MW Francis turbine-generators. Also part of the Çetin project is a smaller dam downstream with in height. The Çetin lower dam will regulate outflows from the Çetin main dam and also produce hydroelectric power with a 112 MW capacity via two 56 MW Kaplan turbine-generators. Construction on the main dam began in December 2011 and the power plant is expected to be complete in 2015. The owner is the Norwegian, Statkraft, at a cost of US $678 million. The Contractor is Yϋksel-iLci Joint Venture, Aphalt Core Subcontractor is Veidekke Industri AS. Of the six dams to be built on the Botan River, it will have the largest power plant 550 MW.〔(【引用サイトリンク】url=http://www.statkraft.com/Images/Faktaark%20Cetin%20ENG%2020120104%20final_tcm9-18726.pdf )〕 ==See also==
*Alkumru Dam – downstream, completed in 2011
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Çetin Dam」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|